Search results
Search list
Results in:
DIN CLC/TS 50658
Cable management systems (CMS) providing support for cables with intrinsic fire resistance; German version CLC/TS 50658:2025
DIN EN 13480-4/A1
Metallic industrial piping - Part 4: Fabrication and installation
DIN EN 00134315
Modular mechanical locked floor coverings for floating installation – Underlays – Specification, requirements and test methods
DIN EN 00134316
Modular mechanical locked floor coverings for floating installation - Evaluation of the thermal behaviour by way of hot spot testing
DIN EN 00267078
Metallic industrial piping - Part 4: Fabrication and installation
EN 13480-4/prA1
Metallic industrial piping - Part 4: Fabrication and installation
ISO/DIS 25780
Plastics piping systems for pressure and non-pressure water supply, drainage or sewerage - Glass-reinforced thermosetting plastics (GRP) systems based on unsaturated polyester (UP) resin - Pipes with flexible joints intended to be installed using jacking techniques
ISO/TC 189/WG 11
Uncoupling membranes for ceramic tile installation
CEN/TC 67/WG 3
Products for installation of ceramic tiles
NA 005-02-01 AA
Roof covering products for discontinuous laying and products for wall cladding (national mirror committee for CEN/TC 128)